Construction schedule coordinator
PipeFlo Contracting Corp
Hamilton, ON
· Canada
Hibo job snapshot
Hibo normalizes key facts from the listing so they are easier to compare with other opportunities. Always confirm the final details on the original source before applying.
Employer
PipeFlo Contracting Corp
Location
Hamilton, ON
Employment type
Permanent employment Full time
Workplace
On site
Salary
$ 29.00 HOUR hourly
Posted
Nov 9, 2026
Listing type
1 source tracked
Hibo market context
These counts come from active jobs currently tracked in Hibo and help put this listing in context. They are not official labour-market statistics.
491
active jobs Hibo currently tracks in Hamilton
24,771
active jobs Hibo currently tracks in Ontario
1
active PipeFlo Contracting Corp listings currently tracked by Hibo
Original listing excerpt
*Company Overview* PipeFlo Contracting Corp. is outfitted with the latest trenchless robotic technology and equipment for pipeline inspection, maintenance and rehabilitation of water distribution and wastewater collection systems and industrial process piping. PipeFlo is a construction contractor focused on installation of specialized trenchless technologies designed and manufactured in Europe & USA for infrastructure repair: *Mainline Full Length Lining (BKP Germany) ? *UV Cured in Place Pipe *Lateral Lining (Speedylite Spain)? *LED Cured in Place Pipe *Robotic Inspection & Cutter (ProKasro Germany) ?* Pipeline milling robot *Spot Repair & UV Top Hat Systems (Cosmic Austria)? *UV Cured Short Liner (pipeline point repair) *Chemical Grouting and Sealing Repairs (CUES USA)?* non-structural process to stop infiltration into mainline joints s...
Hibo shows only a short excerpt here. Read the complete vacancy, qualifications and application instructions on Job Bank before applying.
Listing transparency
Primary source
Job Bank
Sources detected
1
Hibo last checked
Nov 9, 2026